Set up the Coir Matting in the trench. Spot no less than 12 inches in the roll above the trench (further up the slope). Place Just about every staple a couple of foot apart In the trench Positioning: Area the coir logs in the waterline or along the edge in https://erickhfsfi.blog5.net/77963152/getting-my-coir-mats-to-work