Originally, the Jai Hind metro station was prepared to generally be elevated. On the other hand, the AAI objected the elevated stretch up for the airport may well pose a menace to aircraft, so the route was additional reworked along with the station was shifted underground, 150 m in the https://garrettkanzm.wizzardsblog.com/32011328/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf