The 25mm thick large steel tube is pushed Together with the close closed by a steel shoe. On achieving the expected driving resistance, a complete length cage is reduced in towards the tube and filled with high slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://conneruvtqm.ambien-blog.com/38874405/the-definitive-guide-to-cast-in-situ-piles