The main park contains a potential of 200 MW though Sandrini II has a capability of 100 MW. The overall price of the two tasks were not disclosed even so, during development, around 200 personnel had been utilized. The assignments are predicted to view a handful of positions opening up https://solarinstallersinoakland.blogspot.com/