The initial park has a potential of 200 MW whilst Sandrini II incorporates a ability of one hundred MW. The entire cost of both of those jobs weren't disclosed even so, through design, around two hundred personnel ended up used. The initiatives are expected to determine A few positions opening https://solarcompanyfremont.blogspot.com/2024/08/how-to-find-best-california-solar.html